Bishop Jerome Institute, Kollam

A new campus network across the Engineering, Management and Architecture blocks, about 2.5 lakh sq ft, built after a full audit of the old one.

  • Kollam
  • Education

The brief

Bishop Jerome Institute runs its Engineering, Management and Architecture courses from three blocks, about 2.5 lakh sq ft in all. Our audit of the existing network found performance problems, limits in the old layout and security gaps.

The institute wanted a modern campus network, a proper server room, and the new network joined to its existing firewall.

What we did

  • Audited the existing network across the campus and planned the new one.
  • Designed the ELV layout for all three blocks: data, voice and CCTV points, cable routes and equipment locations.
  • Laid structured cabling, with an optical fibre backbone between floors and between blocks.
  • Built a dedicated server room for the core equipment, linked to the campus backbone.
  • Supplied, installed and configured the core switches, routers and firewall appliances.
  • Connected CCTV across the campus buildings to the new network.
  • Joined the new network to the existing firewall, with internet access rules set to the institute’s requirements.
  • Installed campus Wi-Fi with guest access, managed from one place.

The result

One campus network across three blocks. Fast fibre links between floors and buildings, a proper server room, and Wi-Fi and internet access controlled from one place.

More projects

  • I Mall, Kollam

    Head office and branch offices

    A complete IT upgrade for the head office and branches: cabling, network and security, servers, email and phones, from one team.

    • Kollam
    • Retail
  • Birla Open Minds School, Kollam

    One team for every system in the school. Cabling in trays to each classroom and office, CCTV inside and around the campus, biometric access and campus Wi-Fi. IP phones for the office and a firewall that keeps students safe online.

  • Skylar International School, Kollam

    ELV design and installation for a multi-storey school, from the classrooms to the perimeter. Structured cabling in trays, CCTV, biometric access, Wi-Fi and IP phones. A firewall filters internet access for students and staff.

Planning an ELV package? Send us your drawings and BOQ.

We reply with a clear scope and a quote. If you do not have drawings yet, we will visit the site and work it out with you.